  • GME – Roof Extention

    Owner

    GME

    Consultant

    MEG

    Scope of Work

    The project involved the dismantling of the existing steel structure and roof cladding, including all related electromechanical works within the designated area located at the center of the plant. It also included the supply and casting of new footings, ensuring a stable foundation for the extended structure. Further, the scope covered the fabrication and installation of all new steel structures, providing enhanced durability and load capacity. Finally, the project comprised the supply and application of all roof and side cladding works, ensuring complete enclosure and protection for the extended section.

    Project Title

    Roof Extension Project – Industrial Zone, 6th of October (2008–2023

  • GME – pneumatic pipe

    GME – pneumatic pipe

    Owner: GME
    Consultant: MEG
    Location: Industrial Zone, 6th of October
    Project Duration: 2008 – 2023
    Scope of Work: Supply and installation of the pneumatic system for the body assembly line, including all required mechanical, electrical, and control components to ensure full system efficiency and integration within the production process.
  • GME – paintshop washroom rennovation

    Owner: GME
    Consultant: MEG
    Location: Industrial Zone, 6th of October
    Project Duration: 2023
    Scope of Work: The project involves comprehensive renovation and finishing works, including interior and exterior upgrades, enhancement of architectural elements, and improvements to ensure high-quality standards and modern design alignment.
  • GME – paintshop extension project

    Owner

    GME

    Consultant

    MEG

    Project Overview

    The Paint Shop Extension Project aimed to increase production capacity from 5,000 cars/year to 50,000 cars/year through four key phases that included structural, mechanical, and automation upgrades.

    Phase 1 – Structural and Mechanical Works

    Included the design, fabrication, and erection of a new steel structure, supply and installation of chequered plates, and roller beds with full connection to the existing paint shop system.

    Phase 2 – Painting System Upgrade

    Involved dismantling the old painting cabins, installing new modern cabins, and implementing new control panels alongside complete electromechanical works to enhance efficiency and reliability.

    Phase 3 – Mezzanine Construction

    Focused on the design, fabrication, and erection of a second mezzanine steel structure (over-deck type) to expand operational and maintenance access areas.

    Phase 4 – Robotics Integration

    Execution of 10 new automated painting robots with all necessary electromechanical systems to achieve high precision and productivity.

    Contributing Companies

    Sailem Korea Eins Korea A-H-C Egypt

  • GME – mixroom

    Owner

    GME

    Consultant

    MEG

    Scope of Work

    The scope of work for the Mix room includes the supply and casting of all P.C. and R.C. works, encompassing footings, shells, columns, beams, and slabs. It also covers the supply and application of all arrangement works for the project, as well as the supply and application of all fire-rated doors. Additionally, it involves the supply and application of all electromechanical works, the supply and application of all fire fighting systems with connection to the main loop, and the supply and application of all fire alarm systems with connection to the main loop. Finally, it includes the design, fabrication, and erection of all steel structures, such as bridges, pipe rackings, and more.

    Location

    Industrial zone, 6th of October

    Project Duration

    2008-2023

  • GME – GCA project

    Owner

    GME

    Consultant

    MEG

    Location

    Industrial Zone, 6th of October

    Project Duration

    2008 – 2023

    Scope of Work

    The project included the fabrication and installation of a multi-store steel structure building, ensuring durability and precision in construction. It also involved the supply and application of decking sheets, followed by the supply and casting of reinforced concrete slabs to provide a strong structural foundation.

    Further works covered the supply and application of all arrangement works, including architectural finishes and detailing. Additionally, the scope extended to electromechanical installations, light current systems, and flooring epoxy applications, delivering a complete and integrated industrial facility.

  • GME – Fire Fighting Loop

    Owner: GME
    Consultant: MEG
    Scope of Work:
    The project included the implementation of 2,700 meters of new fire-fighting pipelines with diameters of 14″, 12″, 8″, and 6″, fully connected to the main fire-fighting loop to ensure system integration and efficiency.
    Civil Works:
    The scope covered excavation and dewatering (if required), soil compaction, and placement of new sand layers to prepare a stable base for the network installation.
    Mechanical Works:
    It involved welding and testing of all pipes and flanges, the application of a 4mm waterproof membrane for underground pipelines, and installation of all types of valves to ensure system reliability.
    Structural Works:
    The project also included casting and installation of pipe racks for all above-ground pipelines, ensuring proper support, alignment, and long-term durability of the fire-fighting system.
  • GME – conveer system

    Owner

    GME

    Consultant

    MEG

    Scope of Work

    Project Title: Conveyor System Project Location: Industrial Zone, 6th of October Project Duration: 2008 – 2023 The scope includes the design, fabrication, and erection of six steel sheds along with all related steel structures. It also encompasses the supply and casting of all reinforced concrete (R.C.) trenches, pits, and structural elements, as well as the supply and application of all cladding works for warehouses and sheds. Additionally, the project involves the design and installation of two water test booth mechanical systems, including full booth construction. The fabrication and erection of steel sheds with all associated architectural finishes are also part of the scope. Finally, the execution of civil and arrangement works for the Squake Rattle Track, dedicated to vehicle testing operations, is included.

  • GME – chillar project

    Project Details

    The Chiller Project was executed in the Industrial Zone, 6th of October, spanning from 2008 to 2023.

    Owner and Consultant

    The project was owned by GME, with MEG serving as the consultant.

    Scope of Work

    The scope encompassed the supply and installation of a new chiller unit manufactured by Trane Company, along with a complete piping network. The project also involved the supply and installation of four axial pumps integrated with a full piping system. Additionally, it included the dismantling of old pumps and existing piping, as well as the fabrication and erection of all related steel structures to ensure optimal performance and system efficiency.

  • GME – chemical warehouse

    Owner: GME

    Consultant: MEG

     Location

    Industrial Zone, 6th of October

    Project Duration: 2008 – 2023

    Scope of Work 

    Civil Works:
    • Supply and apply of all civil works including excavation and DPU (Diversion of Public Utilities).
    • Supply and casting of all footings.
    • Supply and application of all walls and reinforced concrete beams.
    • Fabrication and installation of the steel roof.
    • Supply and application of all cladding works.

    Architectural & Arrangement Works:

    • Supply and installation of remote-controlled roll-up doors.
    • Flooring works including drainage systems.
    • Sanitary and ceramic works.
    • Aluminum works.
    • Supply and installation of fire-rated doors.

    Electromechanical Works:

    • Supply and installation of all firefighting systems and connection to the main loop.
    • Supply and installation of all alarm systems and connection to the main loop.
    • Supply and installation of all electrical networks.
    • Supply and installation of all light current networks.
  • GME – bodyshop washroom rennovation

    Project Owner

    GME

    Scope of Work

    Renovations and Finishing Works

    Location

    Industrial Zone, 6th of October

    Project Date

    2023

  • GME – ASRS Mezzanine

    Owner: GME
    Consultant: MEG
    Location: Industrial Zone, 6th of October
    Project Duration: 2008 – 2023
    Scope of Work
    • Compressors Project: Application of (2×375 kW) oil-free compressors (Atlas Copco).
    • Piping & Valves: Supply and installation of all related pipes and valves.
    • R.C Flooring: Supply and casting of 6000 m² reinforced concrete flooring (20 cm thickness), including subbase and sewage system beneath.
    • ASRS Mezzanine: Design, fabrication, and erection of all steel structures; supply and installation of chequered plates and roller doors.
    • Stacker Project: Construction of a 7-floor stacker warehouse, complete with electromechanical works.
  • Fish Market

    Fish Market

    Project: Catering For Restaurants Co
    Scope of Work: Steel design and shop drawings of the structure, fabrication, and erection of the steel structure.
    Location: Al Alamein – North Coast
    Year: 2022
  • exxon mobil egypt

    Owner: ExxonMobil Egypt
    Main Contractor: Rolaco Co.
    Consultants: Soliman, EHAF, ECG
    Scope of Work: —
    Location: Various
    Duration: 14 Years
  • Al-araby group – tanks

    Al-araby group – tanks

    Project Owner: El-Araby Group
    Scope of Work: Manufacturing and supplying air tanks of various capacities
    Location: Qaloub, Banha, and Qewsna
    Duration: Total of 20 years
  • Al-araby group – Paint basins

    Al-araby group – Paint basins

    Owner: Al-Araby Group
    Scope of Work: Sandblasting and repainting of basins, with internal PVC insulation and external fiberglass coating
    Location: Banha
    Duration: 2023
  • Al-araby group – chimney

    Al-araby group – chimney

    Owner: Al-Araby Group
    Scope of Work: Supply & Installation of Paints Oven Chimneys
    Location: Qaloup, Banha & Qewsna
    Duration: Total 20 Years
  • kasrawy jetour body assembly line

    kasrawy jetour body assembly line

    owner: Kasrawy automotive industry
    scope of work:
    welding line installation jetour model
    1-installing steel structure
    2- installing chiller pipes
    3- installing fixative
    4- installing compressor pipes
    5- installing cable tray & main cable and sub cable
    6- articulated arm measurments
    7- installation hoist
    location: K28 abo rawash
    year: 2024
  • kasrawy JAC body assembly line

    kasrawy JAC body assembly line

    owner: Kasrawy automotive industry
    scope of work:
    welding line installation jetour model
    1. installing steel structure
    2. installing chiller pipes
    3. installing fixative
    4. installing compressor pipes
    5. installing cable tray & main cable and sub cable
    6. articulated arm measurments
    7. installation hoist
    location: industrial zone 6th of october
    year: 2024
  • Al-Abbasiya Chest Hospital

    Al-Abbasiya Chest Hospital

    Owner: ministry of health
    Main contractor :wady el nil Contracting & realestate investments Co.
    Consltant:  DSC
    Scope of work :phase 1 supply & casting All R.C Repairs For Footing,Columes,beams For The New Bulding including: Drilling rebars embeddement With Epoxy , Shotcreting …etc Phase 2 Supply & casting 600M3 R.C Underground Tank complete With All Protection Work Phase 3 Supply & casting All Concrete Works in The New exttension project Including Footing R.C retaing Walls Roofs Stairs * Supply and apply all arrangement works for the new extention building *supply and apply all lead proofing workes for X-Ray And Gama-Ray chambers phase 4 *Supply and Apply All Metal Frames Of All Doors (400 frame) including Electrostataic Paint *Supply All hardware for all doors
    location :Al Abbasiya- Cairo
    year: 2021-2023
    Area : 7000 m2