Owner
GME
Consultant
MEG
Location
Industrial Zone, 6th of October
Project Duration
2008 – 2023
Scope of Work
The project included the fabrication and installation of a multi-store steel structure building, ensuring durability and precision in construction. It also involved the supply and application of decking sheets, followed by the supply and casting of reinforced concrete slabs to provide a strong structural foundation.
Further works covered the supply and application of all arrangement works, including architectural finishes and detailing. Additionally, the scope extended to electromechanical installations, light current systems, and flooring epoxy applications, delivering a complete and integrated industrial facility.