Category: Projects

  • Villa Dr ahmed Gazr

    Villa Dr ahmed Gazr

    Owner

    DR Ahmed gazr

    Scope of Work

    *supply & Apply All arrangement works *Supply & cast P.C & R.C For The swimming Pool *Supply and Apply all arrangement works for the swimming pool including waterproofing , ceramic , stainless steel handrails , pump ….etc *Supply & Apply the pergola iculuding steel structure , R.C flooring , wood works …etc *Supply and Apply all land scape works including fences, gate…..etc

    Location

    swan lake compound

    Year

    2021

  • National company for maize products

    Owner:

    National Company for Maize Products

    Scope of Work:

    The steel structure work of the Glucose building

    Location:

    10th of Ramadan City

    Year:

    2014
  • meditex factory

    meditex factory

    Owner

    meditex

    Scope of Work

    All civil works

    Location

    industrial zone obour city

    Year

    2025
  • EMARAT MISR

    EMARAT MISR

    Owner

    EMARAT MISR is the proud owner of this project, overseeing its development and execution with a commitment to excellence.

    Consultant

    NPPI serves as the consultant, providing expert guidance and technical support to ensure the project’s success and compliance with industry standards.

    Scope of Work

    The scope of work encompasses the design, fabrication, and installation of the steel structure for the gas station, delivering a robust and reliable infrastructure.

    Location

    The project spans multiple locations, including El meerag Station, Sadat Station, CFC Station, and Ain sokhna Station, catering to diverse regional needs.

    Duration

    The total duration of the project is set at 4 years, reflecting a comprehensive timeline to achieve high-quality results across all phases.

  • Al-Tayseer Healthcare Group

    Al-Tayseer Healthcare Group

    Owner

    • Al-Tayseer Healthcare Group

    Scope of Work

    • Stage 1
      • Design, Fabrication and Erection of Sidewalks in the 4th, 5th, and 6th Floors
    • Stage 2
      • Design, Fabrication and Erection of All Steel Structure For The Following:
        • Boilers Shed
        • Chillers Shed
        • Restaurant
      • All Cladding Works
    • Stage 3
      • Design, Fabrication and Erection of All Steel Structure For Entrance Area
      • All Decking Works

    Location

    • Zagazig

    Year

    • 2021-2022
  • Villa Eng Tarek Shokry

    Villa Eng Tarek Shokry

    Owner: Eng Tarek Shokry
    Consultant: Arabia Holding
    Scope of Work
    • Steel Design and Shop Drawing: Preparation of detailed designs and shop drawings for the swimming pool and mezzanine structures.
    • Fabrication & Erection: Complete fabrication and installation of steel structures on site.
    • Decking Works: Supply and application of all decking materials and finishes.
  • villa eng essam kfafy

    villa eng essam kfafy

    Owner: Eng. Essam Kafafy
    Scope of Work
    The project included supply, fabrication, and erection of steel structures for the landscape, along with renovation of the building facade.
    It also covered reinforced concrete works for floors and supply and installation of the fire system to ensure full safety compliance.
  • Villa Dr Gazr

    Villa Dr Gazr

    Owner: DR Gazr
    Scope of Work
    The project included full arrangement works, covering all necessary installations and finishes.
    Swimming Pool Works
    Supply and casting of P.C. and R.C. structures for the swimming pool. Applied all arrangement works including waterproofing, ceramic finishes, stainless steel handrails, and pump installations.
    Pergola Works
    Supply and application of the pergola, including steel structure, R.C. flooring, and wood works.
    Landscape Works
    Complete landscape implementation, including fences, gates, and other exterior finishes.
  • tayseer med

    tayseer med

    Owner: Tayseer Med
    Scope of Work
    Fabrication and erection of the metal base for the chiller, ensuring full structural stability and precise alignment for operational efficiency.
    Location
    Obour Industrial Area, Egypt
  • Sika Egypt

    Sika Egypt

    Owner: Sika Egypt
    Scope of Work – Stage 1
    Supply and install the new fire fighting line and connect it to the existing firefighting network. The works included inspection, testing, and commissioning of the complete network, including pipes, valves, and pumps.
    Scope of Work – Stage 2
    Demolish the old reinforced concrete (R.C) floor completely and remove all debris to the municipality. Supply and cast a new R.C floor for the production plant, ensuring full structural compliance.
  • Rashideen Egypt maadi branch

    Owner: Rashideen Egypt
    Consultant: Mak Engineering Office
    Scope of Work:
    • Preparation of all shop drawings and obtaining approvals prior to execution.
    • Fabrication and erection of escape ladders, including supply and casting of all related concrete works.
    • Supply and application of landscape works in the related areas of work.
    • Supply and arrangement works for the warehouse, ensuring functionality and safety.
    • Completion of all landscape finishing works in the designated project zones.
  • Rashideen Egypt bani sweif branch

    Location: Bani Suef, Egypt
    Scope of Work:
    The project focused on the complete renovation of Rashideen Egypt’s Beni Suef branch. The renovation included all arrangement and finishing works, ensuring modern functionality and an upgraded interior environment.
    The work aimed to enhance the branch’s efficiency and aesthetics, creating a more practical and visually appealing workspace that aligns with the company’s operational standards.
  • petrojet clamps

    petrojet clamps

    Owner: Petrojet
    Scope of Work: The project involved the fabrication of 400 tons of clamp pipes, executed with precision and adherence to the highest industrial standards
    to support the infrastructure requirements of the Zohr Field Project.
    Location: Zohr Field Project, Egypt
  • Nissan egypt

    Nissan egypt

    Project Title: Welding Line Installation – Sentra Model (2025)
    Owner: Kasrawy Automotive Industry
    Location: Industrial Zone, 6th of October
    Scope of Work:
    The project involves the installation of the welding line for the Sentra model, including:
    • Installing the steel structure to support the production line.
    • Installing chiller pipes to ensure optimal cooling during operations.
    • Installing compressor pipes to provide the necessary air supply for welding processes.
  • new constriction chemical

    Owner: New Construction Chemical
    Location: Fifth Settlement Industrial Zone
    Year: 2024
    Scope of Work: Supply and installation of HPL panels for WC areas, ensuring high-quality finishing, durability, and compliance with industrial standards. The work includes precise fitting, moisture-resistant materials, and a clean, modern appearance suitable for industrial environments.
  • Midtown sky Mall

    Midtown sky Mall

     Owner: Better Home
    Main Contractor: Hatoor
    Scope of Work: Execution of all concrete works, ensuring structural strength and high-quality finishing that meets project specifications.
    Location: Midtown Sky, New Administrative Capital
  • Midtown Mall

    Midtown Mall

    Owner: Better Home
    Main Contractor: Redcon
    Scope of Work:
    Fabrication and erection of all steel structures for curtain wall and cladding works within the Midtown Project, executed with precision to ensure high-quality finishes and structural integrity.
    Location: Midtown – New Capital
  • Konouz Egypt ReplicaTreasures

    Konouz Egypt ReplicaTreasures

    Owner: Konouz Egypt Replica Treasures
    Main Contractor: Wady El Nil Contracting & Real Estate Investments Co.
    Consultant: Engineering Group
    Project Area: 10,000 m²
    Scope of Work:
    • Steel Design & Shop Drawings for the entire project.
    • Supply and casting of reinforced concrete footings.
    • Fabrication and erection of all steel structures.
    • Supply and application of steel cladding and decking systems.
    • Supply and casting of reinforced concrete floors.
    • Execution of all architectural arrangement works.
    • Installation of all electrical and light current systems.
    • Application of floor epoxy finishing works.
    Project Details: Konouz Egypt Replica Treasures – Obour City (2019–2020)
  • Icon Egypt

    Icon Egypt

    Project Name

    New Warehouse – Helwan (2022)

    Owner

    Icon Egypt

    Scope of Work

    Design, fabrication, and erection of a complete steel structure for the new warehouse. Supply and application of sandwich panels for the warehouse envelope, ensuring thermal insulation and structural durability.

  • GME – safety net

    GME – safety net

    Owner

    GME

    Consultant

    MAK

    Location

    Industrial Zone, 6th of October

    Project Duration

    2008 – 2023

    Scope of Work

    The project involves the fabrication and erection of a steel structure safety net designed to protect workers and personnel from falling objects caused by crane operations. The scope ensures compliance with industrial safety standards and provides a durable, secure system for enhanced on-site protection.