Owner: GME
Consultant: MEG
Location
Industrial Zone, 6th of October
Project Duration: 2008 – 2023
Scope of Work
Civil Works:
- Supply and apply of all civil works including excavation and DPU (Diversion of Public Utilities).
- Supply and casting of all footings.
- Supply and application of all walls and reinforced concrete beams.
- Fabrication and installation of the steel roof.
- Supply and application of all cladding works.
Architectural & Arrangement Works:
- Supply and installation of remote-controlled roll-up doors.
- Flooring works including drainage systems.
- Sanitary and ceramic works.
- Aluminum works.
- Supply and installation of fire-rated doors.
Electromechanical Works:
- Supply and installation of all firefighting systems and connection to the main loop.
- Supply and installation of all alarm systems and connection to the main loop.
- Supply and installation of all electrical networks.
- Supply and installation of all light current networks.