GME – chemical warehouse
Owner: GME Consultant: MEG Location Industrial Zone, 6th of October Project Duration: 2008 – 2023 Scope of Work Civil Works: Supply and apply of all civil works including excavation and
Owner: GME Consultant: MEG Location Industrial Zone, 6th of October Project Duration: 2008 – 2023 Scope of Work Civil Works: Supply and apply of all civil works including excavation and
Project Details The Chiller Project was executed in the Industrial Zone, 6th of October, spanning from 2008 to 2023. Owner and Consultant The project was owned by GME, with MEG
Owner GME Consultant MEG Scope of Work Project Title: Conveyor System Project Location: Industrial Zone, 6th of October Project Duration: 2008 – 2023 The scope includes the design, fabrication, and
Owner: GME Consultant: MEG Scope of Work: The project included the implementation of 2,700 meters of new fire-fighting pipelines with diameters of 14″, 12″, 8″, and 6″, fully connected to
Owner GME Consultant MEG Location Industrial Zone, 6th of October Project Duration 2008 – 2023 Scope of Work The project included the fabrication and installation of a multi-store steel structure
Owner GME Consultant MEG Scope of Work The scope of work for the Mix room includes the supply and casting of all P.C. and R.C. works, encompassing footings, shells, columns,
Owner GME Consultant MEG Project Overview The Paint Shop Extension Project aimed to increase production capacity from 5,000 cars/year to 50,000 cars/year through four key phases that included structural, mechanical,
Owner: GME Consultant: MEG Location: Industrial Zone, 6th of October Project Duration: 2023 Scope of Work: The project involves comprehensive renovation and finishing works, including interior and exterior upgrades, enhancement

Owner: GME Consultant: MEG Location: Industrial Zone, 6th of October Project Duration: 2008 – 2023 Scope of Work: Supply and installation of the pneumatic system for the body assembly line,
Owner GME Consultant MEG Scope of Work The project involved the dismantling of the existing steel structure and roof cladding, including all related electromechanical works within the designated area located

Owner GME Consultant MAK Location Industrial Zone, 6th of October Project Duration 2008 – 2023 Scope of Work The project involves the fabrication and erection of a steel structure safety

Project Name New Warehouse – Helwan (2022) Owner Icon Egypt Scope of Work Design, fabrication, and erection of a complete steel structure for the new warehouse. Supply and application of