loading

A.H.C - AL-HASSAN FOR CONSTRUCTION

Gallery

Contact Info

  • client
    Sika Egypt
  • Location
    Obour City
  • categories
    Mechanical & Utility Works
  • year
    2023
  • Status
    Finished

SIKA Egypt HDPE & Valve Installation Works

Executed for Sika Egypt in Obour City, the project involved the complete supply and installation of HDPE piping systems along with all necessary industrial-grade valves. These works were designed to enhance fluid distribution efficiency across the facility while ensuring durability and compliance with safety standards. The project was successfully completed in 2023 with precise engineering and coordination.