Owner: GME
Consultant: MEG
Location: Industrial Zone, 6th of October
Project Duration: 2008 – 2023
Scope of Work
-
Compressors Project: Application of (2×375 kW) oil-free compressors (Atlas Copco).
-
Piping & Valves: Supply and installation of all related pipes and valves.
-
R.C Flooring: Supply and casting of 6000 m² reinforced concrete flooring (20 cm thickness), including subbase and sewage system beneath.
-
ASRS Mezzanine: Design, fabrication, and erection of all steel structures; supply and installation of chequered plates and roller doors.
-
Stacker Project: Construction of a 7-floor stacker warehouse, complete with electromechanical works.